- [FIXED] error in pumping signs of the HydroInventory constraint
- [CHANGED] introduce operation costs in CostRecovery output file
- [CHANGED] avoid the introduction of all the nodes in demand and operating reserve input files
- [FIXED] add revenues of ESS generation and consumption operating reserves
- [CHANGED] change sign of the consumption energy and operating reserve revenues
- [FIXED] typo when computing charge revenues in output results
- [CHANGED] detection of units with no energy inflows and no consumption power
- [FIXED] avoid formulation of superfluous ramp or inventory constraints for ESS with no energy inflows and no consumption power
- [FIXED] don't formulate operating reserve constraints for ESS with no energy inflows and no consumption power
- [FIXED] detection of the first time step for each period, scenario, and stage
- [FIXED] decision on the unit commitment at the initial hour done by area instead of by system
- [FIXED] contribution of the operating reserve activation of a consumption unit to eChargeDischarge and eESSTotalCharge constraints
- [CHANGED] avoid warning when updating mTEPES.na
- [FIXED] typo in output results
- [FIXED] control of duration 0 in load levels if there is no period weight or scenario probability
- [CHANGED] default values when there are no StorageType, OutflowsType, or EnergyType to 1 instead of 8736
- [FIXED] minimum up/down time constraints
- [FIXED] units of the operating reserve constraint marginals
- [CHANGED] epsilon in eRampUpState/eRampDwState constraints moved to numerator