Syncgitlab2msproject

Latest version: v0.0.6

Safety actively analyzes 723882 Python packages for vulnerabilities to keep your Python projects secure.

Scan your dependencies

0.0.6

=============
- Add ``--ignore-label`` option :issue:`3`
- Add shortcuts ``-u`` and ``-t`` for gitlab url and gitlab token
- Add `PreCommit`_ to prevent failing builds :issue:`4`
- Fix Bug that percentage done was not calculated correctly :issue:`5`
- Syncing always set Task Type to Fixed Work but revert to original after sync :issue:`6`
- Adding parameter ``--force-fixed-work`` that does not reset the Task Type after sync
- Do not sync work with summary task :issue:`1`

0.0.5

=============
- was only required to get travis to work, now it does!

0.0.4

=============
- First auto release with travis
- Use `Travis AWS`_
- Use travis.com instead of travis.org

0.0.3

=============
- Also use Hyperlink or Text29 URL field to find related issues
- Added documentation on how to fix the OpenURL Problem
- Fixed some sync bugs

0.0.2

=============
- Documentation Only Changes
- Add Badges
- Import Readme to documentation
- Allow build of documentation even without pywin32 installed
- Use ReadTheDoc Sphinx Theme

0.0.1

=============

- First Release

.. _Travis AWS: https://blog.travis-ci.com/2020-09-11-arm-on-aws
.. _PreCommit: https://pre-commit.com/

Links

Releases

© 2025 Safety CLI Cybersecurity Inc. All Rights Reserved.