Updates: * contraDC PCell * New PCell to EBeam-dev: Period Chirped contra DCs * Fix spiral waveguide PCell * added 1310 nm waveguide * added UGC (universal grating coupler) Pcell to dev library * Calibre litho simulation layer * ebeam_gc_te1550_broadband.GDS * SWG rings, SWG_multibox_ring update, in EBeam-dev
0.3.19
Waveguide PCell: disable coerce, which strangely doesn't work when loading a layout.
0.3.18
- DRC files for UBC's ELEC463
0.3.17
- fix grating couplers, which had 2 fibre targets, and simulations wouldn't run
0.3.16
- SEM layer: changed from 26 to 200, to avoid conflict with other PDKs - for process development in 90 nm slab: grating coupler ebeam_gc_te1550_90nmSlab - for 90 nm slab: added rib waveguide type - separating out each cell into their own GDS file
0.3.15
- added ebeam_dc_te1550 layout and model: only supports coupler length parameter